Lenel Lnl-3300-m5 — Installation Manual Upd ((exclusive))

Lenel LNL-3300-M5 Installation Manual — Concise Guide

Input/Output Devices

Step 2: Physical Mounting

Step 1: Unboxing and Inspection

Verify the following components:

5. Relay Outputs (Door Strikes/Maglocks)

The two relays (K1 and K2) are configured as "fail-secure" (normally open) or "fail-safe" (normally closed). Lenel Lnl-3300-m5 Installation Manual UPD

Grounding