Installing the S-TEC 55X Autopilot is a complex procedure that must be performed by authorized S-TEC dealers or technicians with appropriate FAA certification. This draft guide outlines the core components, wiring standards, and checkout procedures typically found in the installation manual. 1. System Components & Layout
A complete S-TEC 55X installation involves both panel-mounted controls and remote-mounted hardware. Panel-Mounted Units:
Programmer/Computer: The main control head for lateral and vertical modes.
Turn Coordinator: Provides the primary rate-based input for the roll axis.
Optional Equipment: Includes an Altitude Selector/Alerter (pre-selector), Remote Annunciator, and HSI/Directional Gyro. Remote-Mounted Units: S-tec 55x Installation Manual
Servos: Roll, Pitch, and optional Trim servos installed using aluminum airframe brackets.
Sensors: An Absolute Pressure Transducer for altitude sensing.
Switches: A/P Disconnect and Trim Master switches typically located on the control yoke. 2. Wiring & Electrical Standards
Wiring must comply with manufacturer and FAA standards to ensure system integrity. Installing the S-TEC 55X Autopilot is a complex
Shielding: Use shielded wire for sensitive signal lines (e.g., pins 36 and 37) and ground shields only where specified.
Grounding: Strict adherence to grounding points is required to prevent interference; solder sleeves are recommended for neat terminations.
Separation: Maintain physical separation between autopilot wiring and other avionics to prevent signal bleed.
Power Requirements: The system typically requires at least 8 volts for stable operation. 3. Mechanical Installation Format: Digital PDF (searchable
Servos are the mechanical "muscles" of the system and require precise rigging.
Attachment: Use bridle cables and extension attachments to connect servos to the aircraft's primary flight control and trim systems.
Brackets: Ensure all aluminum brackets are secured to the airframe according to the specific Supplemental Type Certificate (STC) for your aircraft model. 4. Post-Maintenance Checkout
After installation or maintenance, a mandatory self-test and functional checkout must be completed. S-TEC 55 Wiring Installation Guide | PDF - Scribd
The Installation Manual specifies a robust power architecture to prevent single-point failures.
A typical installation manual runs 120–150 pages. Here are the sections you cannot skip: