A. Initial Power-On Sequence
- Apply power to the SSIS698. Wait for the "Status" LED to stop flashing (approx. 45 seconds).
- Turn on the displays first. Allow them to go fully active.
- Finally, turn on the source devices.
5.2 Forced EDID (Troubleshooting)
If the source doesn’t recognize the display, set Tx DIP #1 ON (internal 4K EDID). Then manually adjust resolution on source to match display’s native resolution.
4. Software & Network Configuration
3.3 Power Up Sequence
- Apply +12V DC (nominal 2.5A peak) – use the supplied locking barrel connector.
- Wait 10 seconds; the front LED will cycle: Red (boot) → Green (standby) → Blue (streaming ready).